Friday, June 4, 2010

House Plans and Week 3 Photos



Almost finalized floor plans above. Sill working on the layout of the second floor of the main building. Other details are being resolved, but thought we should share these now that construction is underway.

Well drilling started today and should finish by early next week. We met Jeremy at a house project he is currently finishing to make a decision about concrete floor finishing. During our conversation there, he mentioned that framing would start within the next 3 weeks. Moving along pretty well, because the weather has been uncharacteristically nice for Vermont.

Also posted more photos from week 3 : click here


Friday, May 21, 2010

Concrete Days

Anchor Foundations arrived on Wednesday and concrete is happening. I stopped by after work today and they were placing the forms for the basement. I’m amazed by how different things look as the footprint for each of the structures becomes defined in 3 dimensions. When we met with Rolf and Jeremy on Monday they told us that throughout the process we’ll have different perceptions of the space—and that this happens in all projects. There’s a shift between things looking too big to seeming too small and back again. And we eventually end up (hopefully) with the space feeling just right. Kind of like Goldilocks and the 3 bears.

Well, this process started for me today. The foundation hole was seeming HUGE to me on Tuesday — and now that the forms are going in, it’s looking much smaller. . . glad I was forewarned of this process. More photos are here http://picasaweb.google.com/tinacvt/VillaVerdeConstructionWeek2#


Sunday, May 16, 2010

Another Planet


Stevie (in the photo) and I went out to the land this morning — the dirt piles keep growing! The basement hole looks complete — and massive to me right now. The landscape is so altered, that it felt almost as though we were on another planet. With great weather forecast for the entire week the concrete work will commence! I’m hoping to swing by during the day to get photos of work in progress.

I’m also in the process of creating spreadsheets for our bathroom and kitchen fixtures and lighting. Hoping to have most of that complete by June 1st, so that things can keep moving, especially since I’m entering my busy season at work.

More later.



Thursday, May 13, 2010

Let the Games Begin


I can’t seem to stay away from the land now that things are happening. Ran out there after work again tonight to see what progress had been made. I’m finding lots of things to photograph out at the building site. Take a look at them here:

http://picasaweb.google.com/tinacvt/VillaVerdeConstructionWeek1#

The first few photos are of a model that Rolf had one of his interns build. We hope to post floorplans sometime soon.

Dig This! Excavation has begun.

First tilling, note driveway. Then excavating according to site plans. Pictured below is Steve from Island Excavating.
















Thursday, May 6, 2010

Furniture Finds

The house excavation hasn’t started yet and we’re already buying stuff to put in the house. Tina made a great find at Barge Canal Market on Pine Street. Two Cantilever Cane Chairs designed by Mies Van Der Rohe in 1927. We’ll need to have some caning repairs done but they are in great condition — the chrome near perfect.


When I went with Tina to check out the chairs we saw a great sofa that seems like a good fit for our main room. It was made by the Troy Sunshade Company probably back in the 50’s or 60’s. Troy Sunshade featured some interesting mid-century designers including Gilbert Rohde and Donald Deskey. We’re uncertain who designed this particular sofa, however, it will also need a little work — the gold, vinyl upholstery is in good shape but not exactly what we’d like.

Monday, April 12, 2010

Foot Pedal Faucets Are Go!




I believe we are going with a foot pedal faucet in the first floor bathroom. Yes, like at the doctor/dentist’s office. I’d love these for all sinks but I guess we will limit it to one.









Here are some quotes I picked up from various websites about why Foot Pedal Faucets Rule:









“Here is a gadget that is almost a must-use in most of the homes across the planet and one wonders why more people are not using this with amount of scarcity that we are facing regarding the fresh water resources available. The Foot Pedal faucet Controllers at your sink allow you to control the flow of the water from your tap using nothing but your feet. They allow you to precisely control both the speed and the duration. They are obviously as simple to use as your toothbrush and it might also give you some early practice with your car accelerators.

Foot pedal faucet controllers allow you to control a faucet hands-free. These devices are efficient and hygienic. You can reduce water use by 50% using pedal controllers, and if it’s hot water, you’ll be saving powertoo. At a sink, you control the flow of a faucet with a pedal much like the accelerator in a car. It’s easier to turn off the faucet when you are brushing your teeth, shaving, or doing the dishes. In a four-person household, the use of pedal controllers in the kitchen alone can save up to 7500 gallons of water annually, as well as conserve the energy needed to heat those gallons.
Hand-free faucet controllers also guard against the transfer of bacteria between faucet fixtures and hand. They are particularly useful when your hands have paint or soil on them. Pedal controllers can be installed relatively easily under the sink and hopefully they will be used more from now on.

The foot-pedal faucet in our bathroom is really a new application of an existing technology used mostly in the medical field. For us, it was a great way to reduce our water usage, to reinforce the clean modern lines of the bathroom, and to make the sink more fun to use.”

“In addition to its novelty and the interest it draws, this pedal-valve system does some pretty cool things. It allows us to use only the water we need and saves a great deal of water we’d otherwise waste, which stretches both our money and our limited resources. Functionally, it keeps more water and soap bubbles off the countertop because we no longer have to reach beyond the sink basin to operate the controls. And aesthetically, it keeps the countertop a little less cluttered for a cleaner look.
Using the pedals is entirely intuitive: You step on the pedal and the water flows; you lift your foot and the water stops. To get warm water, you push both cold and hot pedals at the same time (it’s not as awkward as you might think). So without a second thought, it’s easy to staunch the otherwise constant flow of water down the drain while brushing teeth or washing hands. If you’re a parent, you’ll save your voice because there will be no need to scold the kids for wasting water while at the sink.”